Floor plan and floor planner: draw rooms and actually plan flooring
In the planner you draw one or more rooms, set doors and windows and test floor coverings in different patterns. It calculates cuts, waste, packages and an understandable laying order.
In the building account; Construction site PDF included
Product preview
Floor plan & floor
What you can do
Key features
Draws rectangular, L-shaped, and free-fit spaces with multiple corners.
Plan several rooms next to each other and take transitions into account.
Sets and moves doors and windows on the selected wall.
Supports laminate, parquet, floorboards and tiles in multiple formats.
Shows straight laying, dressing and herringbone as visual variations.
Calculates area, edge pieces, cuts, waste and required packages.
Can avoid narrow last rows through a balanced starting cut.
Creates a construction site PDF with plan, materials and installation steps.
How it works
Step by step
- 1
Draw rooms
Start with a rectangle or L-space. Choose a wall before adding a new corner.
- 2
Set openings
Insert doors and windows on the correct wall and move them to their measured position.
- 3
Align rooms
Place the kitchen, living room or hallway next to each other if you want the floor to continue running without interruption.
- 4
Choose topping
Enter the actual board or plank dimensions, package contents, price, joint and reserve.
- 5
Optimize patterns
Compare direction and association. Activate balanced start if the last row becomes too narrow.
- 6
Take PDF with you
Export plan, cutting, material list and order for purchasing and construction site.
What you need
Requirements
- A property with a building in the account.
- Measured wall lengths, room shape and position and width of the doors.
- For an exact shopping list, product dimensions, package contents and recommended reserves.
Practical guidance
Helpful tips
- Measure each wall individually. Even rooms that appear to be on the right can differ by a few centimeters.
- Plan the laying direction across connected rooms together before ordering materials.
- Avoid very narrow edge pieces. Divide the rest between the start and end rows.
- Print the construction site PDF and check the plan again directly in the empty space.
Deliberate limits
What this tool does not do
- The plan does not replace millimeter-precise measurements on the construction site.
- Uneven walls, niches, movement joints and subsurface defects must be checked on site.
- Manufacturer specifications for minimum lengths, joints, support and room size take precedence.
- Herringbone and complex transitions usually require more reserve and technical experience.
- The export is a work aid, not a work plan with legal binding.
Quick answers
Frequently asked questions
Can I combine several rooms in one plan?+
Yes. Rooms can be arranged next to each other so that direction and transitions are planned together.
How does the planner prevent a last row of just a few centimeters?+
The balanced start shortens the front row to make the start and end wider and visually calmer.
Can I move doors and windows?+
Yes. In the Doors and Windows step, select the opening and wall and set the position to match the measurement.
Does herringbone work like a regular floorboard bill?+
No. The pattern requires its own geometry and usually more waste. The planner shows the additional reserve.
Why do I need a material reserve despite the calculation?+
Cutting, damaged parts, sorting and subsequent repairs can never be completely avoided.
